Monday, February 18, 2013

Flooring progress

A little while ago they started with the carpet in some of the smaller rooms, but since then haven't really made too much progress.  As such the study and bedroom 2 have been carpeted, but bedroom 3, the hallway and the master beedroom are still solid concrete.

Some time between Wednesday and Sunday though they've been in and laid down all the floor boards, so now from the hallway to the back of the lounge room it's all timber looking.  Unfortunately when I got out there on Sunday night it was getting quite dark and reflective, so no decent photos to really be able to post.

Painting still needs to occur in the master and lounge room, doors still need to go on in bedroom 3, and the Hebel fixed up on the front façade.

Other than that though, it's mostly getting there.