A bit of getting sidetracked caused me to do some checking up on the technical rollout report for NBN in my area (and others), which yielded some really good news: It was flagged 'Active' and available for access on October 19 - yay!
Hopefully this will mean there's no excuses or delays whatsoever to actually having internet access from day 1 when everything's completed.
This applies to everyone in our stages 143, 144 and 168; stages 136, 164 and 166 were connected on 12/10/12, and 127 and 145 will be finished this week.
The hunt for a home from the perspective of a single male who's never done this kind of thing before.
Showing posts with label Highlands. Show all posts
Showing posts with label Highlands. Show all posts
Monday, October 29, 2012
Tuesday, October 9, 2012
Site start date
It's been a long battle, with very little positive news in the previous few weeks, but today I got a call that was a little more positive - a site start date.
Assuming nothing goes catastrophically wrong, it looks like site start will be Thursday 18th October. So if we go 20 weeks out from that - which might be a bit unrealistic as it covers Christmas/New Year - I'd be looking mid March to move in :(
Assuming nothing goes catastrophically wrong, it looks like site start will be Thursday 18th October. So if we go 20 weeks out from that - which might be a bit unrealistic as it covers Christmas/New Year - I'd be looking mid March to move in :(
Saturday, June 16, 2012
Auction!
While checking that the weeds had been killed (seems like they haven't), we also decided to go have a look at Metricon's display they were auctioning off for charity just four streets up from my block. It was more or less the same build, but slightly bigger - a Delta 24 on a 12.5x32m block. Most of it was much the same, though the electrical throughout was very basic, with tiles rather than timber.
The auction was a bit of a sad state though - not only were there only about 10 groups of people turn up, many really were there just to have a look. One of the sales agents had a bit of a chat with me, and asked how much I thought it would go for: "Oh, probably around 386, give or take". "Give or take? That's a very specific number". :)
As for actually bidders? Only a single bid at $380k, so I felt sorry for her. To put in any specific number and then not have anyone willing to challenge it basically means you could have said less.
Says a lot about the current market though since this one only just managed to sell.
The auction was a bit of a sad state though - not only were there only about 10 groups of people turn up, many really were there just to have a look. One of the sales agents had a bit of a chat with me, and asked how much I thought it would go for: "Oh, probably around 386, give or take". "Give or take? That's a very specific number". :)
As for actually bidders? Only a single bid at $380k, so I felt sorry for her. To put in any specific number and then not have anyone willing to challenge it basically means you could have said less.
Says a lot about the current market though since this one only just managed to sell.
Sunday, June 10, 2012
The road is complete!
I'll have a bit more of an update with some pics on what we got up to today a little bit later, but the good news for now is that the road the connects things like the shopping center and my street, and everything else of importance, is now open! There was no clear indication of when it was open, but we decided to go that way today just to see if it was, and boy does it make a difference.
For example, previously to get to the Hume Freeway, it was a 7km detour out on to another main road (and through a few sets of traffic lights), and then back up again. Now, it's more like 3km (if that), but I can also use a main boulevard to get straight there without having to take detours etc.
That's certainly going to make checkout out the build much easier, and moving in as well.
For example, previously to get to the Hume Freeway, it was a 7km detour out on to another main road (and through a few sets of traffic lights), and then back up again. Now, it's more like 3km (if that), but I can also use a main boulevard to get straight there without having to take detours etc.
That's certainly going to make checkout out the build much easier, and moving in as well.
Thursday, May 31, 2012
The dirt is browner on the other side.
You might recall a few weeks ago I posted some little spy shots of progress of the houses on the next street over. Well during my trip to ensure everything was in place for settlement, I noticed the fences around those houses had now been taken down, and those houses look much closer to nearing completion. One even has it's own fence!
Being able to get a bit closer makes it a bit easier to figure out what house plans these actually are built on - we know that they're Metricon builds, and while I can't be certain, I would guess that the one on the left, with the darker roof, is a Burton 29.
It's the one on the right though, with the dune coloured roof, that's of most interest.
That's interesting - that room looks very familiar.
Yes, in fact looking around the edge of the house, peeking in through all the windows, I can most definitely say that it appears to be another Metricon Delta.
What size I'm not 100% certain, but I suspect it's a 22 - the four-bedroom variant of what I'm building. If I was desperate, I could probably figure out whether it's a 22 or 24.
But it seems they've gone for all tiles inside, larger windows and sliding door at the back, and generally a fair amount of upgrades inside.
Lastly, I went for a bit of a walk around the block to see how things have progressed, and around the corner was this little garden. When I do the garden I'll not be planting any grass out front, as I simply don't want to have to mow a tiny patch. I'm not looking to do anything quite a silly as this, but I thought it was cute. Seems like they might want to be gluing those stones down though.
Developer approval: Received.
It would be good news if there were nothing else in the way to be done, but I had a quick call to update me on what's happening - the latest being that the developer approval has already come back. Clearly the colours aren't too out-there.
They've now submitted the report and consent, because my garage sits something like 15cm too high, and those 15cm are what will end up costing maybe three to four weeks. After that, it's go, go, go!
In the meantime there's one thing I have to chase up - a letter from the solicitor basically giving them some kind on written proof that the land has settled - they need to be told in writing, basically, which is fair enough so you don't end up with people just going "yep, go ahead", only to find they don't actually own the land.
We're also waiting on a valuation to come back from the bank, but I think that will be fine. It might come back a few thousand short, but so long as it doesn't come back 20% short, it's all good.
They've now submitted the report and consent, because my garage sits something like 15cm too high, and those 15cm are what will end up costing maybe three to four weeks. After that, it's go, go, go!
In the meantime there's one thing I have to chase up - a letter from the solicitor basically giving them some kind on written proof that the land has settled - they need to be told in writing, basically, which is fair enough so you don't end up with people just going "yep, go ahead", only to find they don't actually own the land.
We're also waiting on a valuation to come back from the bank, but I think that will be fine. It might come back a few thousand short, but so long as it doesn't come back 20% short, it's all good.
Tuesday, May 29, 2012
Settlement Complete
Well, that's that out of the way. Just got the call to confirm that the settlement on the land is now complete, so I now actually officially own my own little patch of soil.
Or the bank owns another patch of soil. Whichever. I'm going to pretend it's the former :)
Oh, and I've a few photos to share from the snoop around on the weekend that were taken over the weekend... soon.
Or the bank owns another patch of soil. Whichever. I'm going to pretend it's the former :)
Oh, and I've a few photos to share from the snoop around on the weekend that were taken over the weekend... soon.
Saturday, April 7, 2012
More spying on the neighbors
While not much is going on and I had even less to do at Easter, I paid a little visit to the block to see what has changed in the last two weeks.
Of note, the properties on Serenity Way seem to making significant progress - if you see my posts from the 17th, you'll see they had frame, roof and insulation installed, but no sign of bricks just yet.
Of note, the properties on Serenity Way seem to making significant progress - if you see my posts from the 17th, you'll see they had frame, roof and insulation installed, but no sign of bricks just yet.
Sunday, April 1, 2012
How to piss off a buyer
When I purchased, the promo going was for, effectively, a $6,000 rebate. Now keep that figure in mind when we go through the next figures. That promotion ended at the end of February. To the best of my knowledge they didn't have a promo running in March.
The first home owners grant (FHOG) currently sits at $7,000, and the first home owners boost (FHOB) at $13,000.
So imagine my surprise today when I happened to be looking at a builders website and saw a new promo offer for the Highlands area - 'Stockland triples the First Home Owners Boost'. That means the effective grant and promo you're getting is $46,000!
I'm not sure I could feel more robbed at that. It effectively means that because I'm already in to a contract, even though it's not settled, I lose out on $20k to go towards a home.
Talk about ouch! :(
The first home owners grant (FHOG) currently sits at $7,000, and the first home owners boost (FHOB) at $13,000.
So imagine my surprise today when I happened to be looking at a builders website and saw a new promo offer for the Highlands area - 'Stockland triples the First Home Owners Boost'. That means the effective grant and promo you're getting is $46,000!
I'm not sure I could feel more robbed at that. It effectively means that because I'm already in to a contract, even though it's not settled, I lose out on $20k to go towards a home.
Talk about ouch! :(
Sunday, February 26, 2012
Land payment
I had to get back to Melbourne for what was going to be a reasonably straightforward meeting - signing some contracts. This time, for the land.
My solicitor had already been over everything, and they had a mountain of paperwork ready for me to sign - three copies all up. Basically the process involved going through various bits of the contract, initialing every page of inserts, initialing anywhere they had added details, and signing various pages.
Three times.
But that effectively means it was all sorted on the land side - I finally have a block. Well, sorta. It still has to be paid for. And for that, you need to arrange a loan from the bank. Unless you're paying with pennies.
As a little gift I was also given, as they explained it, "so you can have a picnic on your new block" - a nice cooled/insulated picnic basket, rug, picnic plates, cutlery, cups etc.
Now I just need to get the finance-types to work their magic.
My solicitor had already been over everything, and they had a mountain of paperwork ready for me to sign - three copies all up. Basically the process involved going through various bits of the contract, initialing every page of inserts, initialing anywhere they had added details, and signing various pages.
Three times.
But that effectively means it was all sorted on the land side - I finally have a block. Well, sorta. It still has to be paid for. And for that, you need to arrange a loan from the bank. Unless you're paying with pennies.
As a little gift I was also given, as they explained it, "so you can have a picnic on your new block" - a nice cooled/insulated picnic basket, rug, picnic plates, cutlery, cups etc.
Now I just need to get the finance-types to work their magic.
Tuesday, February 14, 2012
Deposit paid
Paid the initial deposit today.
Okay, that's a pretty concise summary :)
Okay, that's a pretty concise summary :)
Sunday, February 12, 2012
Found a block
Looks like it's barely taken 24 hours before for another option to come forward - this time a block that fit both the size and budget requirements!
It took a few days before we could get out there to investigate, but the short version is the location is fantastic!
Just a hundred meters to the east is Malcolm creek, and the walking/running track that goes basically the whole way around the Highlands area. And if it's groceries or coffee anyone's after, that's just a 500 meter walk across the creek - so it's not like it's a major thoroughfare for traffic.
Plus, we're adjacent to a corner block, so I don't anticipate there being cars parked all over the place on one side.
The street is already partly built up down the other end, so we already have neighbours; the other end, on the other hand, is completely bare land, as is the case for most of the streets around this area. It seems like most of the houses already on the street were Henley Ready Built homes, which we'll have to look in to when it comes to deciding on facades.
Oh yeah - and our nearest current neighbours have already found a flagpole.
It took a few days before we could get out there to investigate, but the short version is the location is fantastic!
Just a hundred meters to the east is Malcolm creek, and the walking/running track that goes basically the whole way around the Highlands area. And if it's groceries or coffee anyone's after, that's just a 500 meter walk across the creek - so it's not like it's a major thoroughfare for traffic.
Plus, we're adjacent to a corner block, so I don't anticipate there being cars parked all over the place on one side.
The street is already partly built up down the other end, so we already have neighbours; the other end, on the other hand, is completely bare land, as is the case for most of the streets around this area. It seems like most of the houses already on the street were Henley Ready Built homes, which we'll have to look in to when it comes to deciding on facades.
Oh yeah - and our nearest current neighbours have already found a flagpole.
Saturday, February 11, 2012
Stockland Highland
Off to the land sales office.
Here's where we're at: Metricon have said to us "okay, give this lot number to the sales rep, and we'll see if w can go from there".
First thing we do - "Hey, is this lot still available?"
Bugger - no it's not. Yeah, saw that coming.
Okay, so what else do we have available?
We were given another option of an equivalent size blocks, which was apparently the only one left, but it was opposite some town houses - wasn't terribly appealing. That was a problem for the time being.
Fortunately the prices we were being given on other blocks were reasonably similar - but we still had to find a block that actually works.
The other thing about both these blocks are that they likely wouldn't be ready to title for maybe six months. Not really a big problem at this stage.
Problem we found out almost straight away though was that we had discussed a slightly larger version of the house build after the initial quote - and it wasn't going to fit on the blocks we discussed.
Doh. Guess that means that for now there's nothing immediately available.
Here's where we're at: Metricon have said to us "okay, give this lot number to the sales rep, and we'll see if w can go from there".
Bugger - no it's not. Yeah, saw that coming.
Okay, so what else do we have available?
We were given another option of an equivalent size blocks, which was apparently the only one left, but it was opposite some town houses - wasn't terribly appealing. That was a problem for the time being.
Fortunately the prices we were being given on other blocks were reasonably similar - but we still had to find a block that actually works.
The other thing about both these blocks are that they likely wouldn't be ready to title for maybe six months. Not really a big problem at this stage.
Problem we found out almost straight away though was that we had discussed a slightly larger version of the house build after the initial quote - and it wasn't going to fit on the blocks we discussed.
Doh. Guess that means that for now there's nothing immediately available.
Location:
Craigieburn VIC, Australia
Subscribe to:
Posts (Atom)











